Home Big Kuwait Arabi group's awarded a contract of $312 million for Mechanical Maintenance...

Kuwait Arabi group’s awarded a contract of $312 million for Mechanical Maintenance services at Mina Al Ahmadi Refinery

Kuwait National Petroleum Company (KNPC) assigned the project “Mechanical Maintenance of Refinery and Gas Liquids Production Facilities – Mina Al Ahmadi”.

The project has been assigned to Kuwait based Oil & Gas firm, Arabi Enertech K.S.C.

The value of the awarded contract is KWD 94,888,888.000.

During December 2019, a total of 6 companies has submitted the proposals. Upon technical and commercial evaluation, the project has been awarded to the contractor. (read more)

Project Description:

KNPC invited the bid for Mechanical Maintenance of Refinery and Gas Liquids Production Facilities – Mina Al Ahmadi, in August 2019. KNPC invited a total of 14companies during the bidding stage.

The scope of work requirements is segregated into two major portions “Supply of Manpower Portion” and “Provision of Services Portion”.

The provision of manpower portion covers the supply of skilled and semi-skilled manpower either as Base Maintenance Workforce or as Additional (Temporary) Workforce, to execute different maintenance activities.

Under the supply of Service Portion of the Contract, the Contractor shall carry out specified Maintenance and/or Operation Services tasks and would be accordingly compensated per relevant quoted service lump-sum price and/or unit rates.

The major scope of work comprises the maintenance of the following Zones/equipment:

  • Zone 1 (a total of 43 units like Hydrogen Sulphide unit, Nitrogen Plant, Fuel Gas system, etc., )       
  • Zone 2 (a total of 24 units like desalination water plant, utility boiler plant, LPG Bulk storage etc.,)
  • Zone 3 (a total of 28 units like Crude Distillation unit, Firefighting, Hydrogen Production etc.,)
  • Zone 4 (a total of 22 units like waste water treatment system, Fire water system, Heavy oil cooling etc., )
  • Rotating Equipment Division 1/2
  • Main Workshops
  • General Areas

Contract duration is 63 Months comprising 3 Months Mobilization Period

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Car Insurance Company in Saudi Arabia

SALAMA Comprehensive This is a conventional product. This plan includes GCC cover. This plan includes personal accident cover. There...

how much is car insurance in Dubai

How to Estimate the Cost of Car Insurance in Dubai? There are more than 10 different insurance companies...

Top 10 Best Car Insurance Companies In Dubai – UAE

There are two types of insurance policies: comprehensive insurance which covers losses arising from theft, fire, or accidents, and third party insurance...

SNOC begins gas production at Mahani field in Sharjah

Sharjah National Oil Corporation (SNOC) and its partner Italian oil major Eni have pulished the start-up of Mahani-1 gas well, marking the...